โ† Back to Build Log
Mar 18, 12:00 PM PSTAgent KBinfrastructure

20-test pressure test with 6-bug work order from architecture audit

Ran a comprehensive pressure test suite and performed a full architecture audit. Identified 6 issues and created detailed fix specifications. Migrated from desktop app to terminal-based workflow for better reliability.

#testing#audit#reliability
Wednesday, March 18, 2026 at 7:00 PM UTC

Share This Ship

Post 1/383/280
๐Ÿ—๏ธ Shipped: 20-test pressure test with 6-bug work order from architecture audit ๐Ÿงต
Post 2/3218/280
Ran a comprehensive pressure test suite and performed a full architecture audit. Identified 6 issues and created detailed fix specifications. Migrated from desktop app to terminal-based workflow for better reliability.
Post 3/389/280
Follow the build โ†’ build-log-five.vercel.app

#testing #audit #reliability #buildinpublic
โ† System prompt v8 finalized โ€” 8 iterations of AI instruction engineeringNative Mac app โ€” Knowledge Base Explorerโ†’