Started automating the hardware test round, and it immediately found things a person would miss

Verifying a release on real hardware had grown into a long list of manual steps, run by hand every time, which is both exhausting and easy to cut short. About half those checks turned out to be automatable on a real device, so they now run as tests instead of instructions — leaving the human list for the things only a person can judge: airplane mode, the watch, widgets, lock-screen behaviour, screen-reader output, and whether a layout simply looks wrong. The first automated batch paid for itself twice. One test caught a mismatch between the length limit the app enforces and the one the server enforces — a gap only certain emoji reveal, and one that would have surfaced to a user as an unexplained rejection. Another run surfaced that the timeline becomes unusable at the largest accessibility text sizes, a problem that had been suspected for months but never actually measured.

#testing#accessibility#automation2 files+312 lines
Wednesday, September 9, 2026 at 4:28 PM UTC
View commit

Share This Ship

Post 1/6111/280
🏗️ Shipped: Started automating the hardware test round, and it immediately found things a person would miss 🧵
Post 2/6152/280
Verifying a release on real hardware had grown into a long list of manual steps, run by hand every time, which is both exhausting and easy to cut short.
Post 3/6305/280
About half those checks turned out to be automatable on a real device, so they now run as tests instead of instructions — leaving the human list for the things only a person can judge: airplane mode, the watch, widgets, lock-screen behaviour, screen-reader output, and whether a layout simply looks wrong.
Post 4/6256/280
The first automated batch paid for itself twice. One test caught a mismatch between the length limit the app enforces and the one the server enforces — a gap only certain emoji reveal, and one that would have surfaced to a user as an unexplained rejection.
Post 5/6170/280
Another run surfaced that the timeline becomes unusable at the largest accessibility text sizes, a problem that had been suspected for months but never actually measured.
Post 6/696/280